Testing the two 5650A rubidium time sources I have purchased from AliExpress by comparing them to Leo Bodnar GPSDO on 9 October 2026, with the two 5650A devices attached to a large aluminium heat sink.

.

Results of testing the first 5650A rubidium device:

Turning the device on and monitoring it for first 54 minutes:

https://files.ad.thornett.net/astronet/Testing-first-5650A-101126@1753-1847-without-sound.mp4

After approx further 90 mins to allow stabilisation:

https://files.ad.thornett.net/astronet/Testing-first-5650A-101126@2038-2114-without-sound.mp4

.

Results of testing the second 5650A rubidium device:

Longer video from switch on to stabilisation:

https://files.ad.thornett.net/astronet/Testing-second-5650A-091026_20261009_sound-removed.mp4

By Admin

Leave a Reply

Your email address will not be published. Required fields are marked *


This site uses Akismet to reduce spam. Learn how your comment data is processed.