These results were presented by Andrew Sutkowski at the BAA Hydrogen Line Sub-Group Meeting 3/11/2025. His preference is the WVURAIL ones, which are designed as part of the DSPIRA project, and are therefore specifically for H-Line work.

These results were presented by Andrew Sutkowski at the BAA Hydrogen Line Sub-Group Meeting 3/11/2025. His preference is the WVURAIL ones, which are designed as part of the DSPIRA project, and are therefore specifically for H-Line work.
